Warehouse and dispatch: ul. Polna 29, 55-095 Długołęka near Wrocław, Poland

info@gpenergia.com.plENPL

Request a quoteGet a quote

Examples from our work

Two supplies that show how we work: a shorter lead time for a prefabricator and a lower BOM cost for an integrator. Client names are not published.

1 / 2

Switchboard prefabricator, Czech Republic

48-72 hours instead of 6-8 weeks

Client
Switchboard prefabricator
Project
Czech Republic
Scope
PLC and power supply for a prefabrication order
Brands
Siemens, Phoenix Contact
Part numbers
6ES7212-1BE40-0XB0, 2904617

The situation

The list included a Siemens S7-1200 controller (6ES7212-1BE40-0XB0) and a Phoenix Contact QUINT 24 V / 10 A power supply (2904617). The manufacturers quoted 6 and 8 weeks.

What we did

We delivered both items from stock in the EU within 48-72 hours, and prefabrication started on schedule.

2 / 2

Automation system integrator, plant modernisation

9.5% lower cost of the list, complete set in 4 weeks

Client
Automation system integrator
Project
Industrial plant modernisation
Scope
Complete component set for the modernisation
Brands
Schneider Electric, Allen-Bradley, IFM, Phoenix Contact, Siemens
Part numbers
LC1D09P7 and others

The situation

Schneider Electric LC1D09P7 contactors in large quantities, an Allen-Bradley HMI panel, IFM sensors, Phoenix Contact QUINT power supplies and Siemens resistors. The total was above the investor's budget.

What we did

We cut the cost of the list by 9.5% on average and by up to 30% on some items, and delivered the complete set in 4 weeks. The integrator kept both the margin and the deadline.

Every line of your BOM, answered.

Send part numbers or attach your BOM file. We reply with prices, lead times and any alternatives, often within 1-6 hours.